WG 7.0 – Flooring
- Status:
- Active
- Working Group Chair:
- Tom Ricciardelli, SelecTech, Inc.
-
-
Summary of discussions/activities/document reviews during the most recent WG meeting.
- STM7.1 is up for 5-year review. We discussed changes that need to be made. All changes to be made involve changes suggested by the Factory Task Team to make all test methods consistent. These include removing the lower limit from the scope, removing the moderate humidity procedure, adding a meter verification procedure, updating the required reporting section. Even though Acceptance Testing is generally being removed from other test methods, we felt it was important to keep this for flooring since it is important to validate a flooring system after it is installed.
-
The WG reviewed the final draft of the flooring systems training program which is based on ESD TR7.0.
-
The WG reviewed the initial draft of the flooring systems training program which is based on ESD TR7.0.
-
The WG focused on developing an outline and some content for a flooring systems training program based on ESD TR7.0-01.
-
The WG reviewed recently completed work, including TR7.0 “Static Protective Floor Materials”. The final draft, with revisions from the last round of comments, was submitted to TAS for final approval. The WG decided to create a training module based on TR7.0. The June meeting series will be used as a ‘kickoff meeting” for this work.
-
The WG adjudicated the remaining TAS comments on the revision of ESD TR7.0 “Static Protective Floor Materials”. The document will be returned to ESDA Operations to move it forward. The WG reviewed the latest draft of the flooring section of ESD TR20.20.
-
The WG adjudicated the remaining TAS comments on the revision of ESD TR7.0-01 “Static Protective Floor Materials”. The WG reviewed the flooring section of ESD TR20.20.
-
The WG adjudicated the first round of the TAS comments on the revision to TR7.0 “Static Protective Floor Materials”.
Work will continue on the revision of TR7.0 in future conference calls or face-to-face meetings.
-
The committee continued reviewing ESD TR7.0-01. The document will be submitted for TAS review.
-
The committee finalized updates to ESD TR7.0-01 and will submit the document for TAS review before the September meeting series.
-
The committee continued reviewing and revising ESD TR7.0-01.
-
Summary of meeting activities:
The committee reviewed the existing ESD TR 7.0-01 document. A discussion was started on possible broader edits to make and action items were assigned to the committee members.