WG 20.20 – ESD Control Program

Status:
Active
Working Group Chair:
John Kinnear, EOS/ESD Association, Inc.

Related Documents

    1. Welcome (2 minutes)
    2. Assign a note-taker to capture the meeting minutes and a time keeper (2 minutes)
    3. Review Etiquette and Policies Slides (1-3 minutes)
    4. Review Document/WG Activity Status Since the Last Meeting (1-5 minutes)
    5. Discussion Topic (Assign approximate time allotment)Intended Outcome of Discussion:
    6. Discussion Topic (Assign approximate time allotment)Intended Outcome of Discussion:
    7. Review Assigned Action Items - Current and New (2-10 minutes)
    8. Review Parking Lot Items (1-4 minutes)
    9. Other Business (1-4 minutes)
    10. Schedule next meeting (if the discussion topics are not complete, schedule a virtual meeting within 30 days to finish)
  • The task team reviewed the revised wrist straps and gloves sections of ESD TR20.20.

  • Review of ESD TR20.20 continued.

  • The WG performed an initial review of a proposed FAQ for the new ESD Engineer. Although work continues, the WG is mostly dormant

  • The WG discussed the revisions needed for TR20.20 “Handbook for the Development of an Electrostatic Discharge Control Program for the Protection of Electronic Parts, Assemblies and Equipment”

    Sections are being sent to WG Chairs to address any changes needed for their particular focus. 

  • The committee adjudicated industry comments on the five year review revisions of ANSI/ESD S20.20. The document will be submitted for a STDCOM recirculation vote of technical changes and then move the document forward for publication before the end of the year.

  • The committee adjudicated STDCOM recirculation vote comments. The document will be submitted for industry review before the September meeting series.

  • The committee adjudicated STDCOM VBM comments. A technical change was made, and there are No votes, so a STDCOM recirculation vote will be held before the June meeting series.

  • Summary of meeting activities:

    The committee was able to give a status update, as well as review proposed Annex C- Tailoring examples.